Replacement of boilers in the secondary reformer at the ammonia manufacturing plant in Palos de la Frontera

State:

The project aims to replace the three existing heat exchangers with three new double tube heat exchangers.

Objectives

The project aims to replace the three existing heat exchangers with three new double tube heat exchangers. .

In this design neither process gas nor water/steam flows through the boiler shell space. There are no preferred paths and the only parts subjected to high pressure are the gas collecting chambers.

As a result, the double tube design provides non-stop operation, with less damage to the tube bundles and a long service life, as well as optimum exchanger performance.

Other project data

  • This project will lead to annual energy savings of 2,842 toe/year.
  • File no. 305760
  • Registration date: 15/04/2021

Duration

Estimates

Continue reading

Fertiberia_I_D_i_IDI_Proyectos_Industriales_Sistema-eliminación-CO2-planta-amoniaco
Fertiberia_IDI_I-D-i_Proyectos
Installation of high efficiency motors at the Sagunto factory
The aim of the initiative is to replace four...
Fertiberia_IDI_I-D-i_Proyectos
Fertiberia, a leader in the production of green hydrogen and ammonia and high value-added crop nutrition and environmental solutions for industry

What we do

We design and manufacture the most efficient and sustainable products for agriculture and industry

Tools

Services to facilitate our customers’ daily tasks

ESG

Our pillars to ensure sustainable, innovative and committed investments.

R&D&I

Research, development and innovation for sustainable and responsible growth.

Contact us

Scroll to Top