Objective
Replacement of the gas compressor rotor at this plant, changing it for a new and improved design that increases the optimum performance of the previous design by at least 1.5% for the current working point.
This improvement represents an annual reduction in consumption of 2,595 MWh.
Other project data
- File no.: E4IDIN/2019/326
- Grant date: 27/12/2022