Replacement of the urea reactor to improve energy efficiency at the Palos de la Frontera production plant.

State:

The aim of the project is to replace the existing reactor with a highly efficient and reliable design.

Objective

The new model selected has a 9-plate system inside that improves CO2 conversion efficiency. ​.

The aim of the project is to replace the existing reactor with a highly efficient and reliable design, so Fertiberia has requested the most reliable design with improved construction materials and maximum efficiency plate trays.

Other project data

* Image in Spanish

Fertiberia - I+D+i: proyectos industriales. Imagen para el proyecto Sustitución de reactor de urea para mejora de la eficiencia energética en planta productiva de Palos de la Frontera.
  • This project will lead to annual energy savings of 511 toe.
  • File no. 306980
  • Registration date: 08/06/2021

Duration

Budget

Continue reading

Fertiberia_IDI_I-D-i_Proyectos
Installation of four high-efficiency electric motors
The objective of the proposed investment...
Fertiberia_IDI_I-D-i_Proyectos
Imagen de cabecera para el Proyecto "Botella Separadora de Amoniaco" para la planta de Puertollano, dentro de proyectos industriales, mostrando el detalle de planta industrial
Fertiberia’s Avilés plant 2017-2018 competitiveness plan
Project consisting of improvements and adaptations...

Fertiberia, a leader in the production of green hydrogen and low carbon ammonia and high value-added crop nutrition and environmental solutions for industry

What we do

We design and manufacture the most efficient and sustainable products for agriculture and industry

Tools

Services to facilitate our customers’ daily tasks

ESG

Our pillars to ensure sustainable, innovative and committed investments.

R&D&I

Research, development and innovation for sustainable and responsible growth.

Contact us

Scroll to Top