Replacement of boilers in the secondary reformer at the ammonia manufacturing plant in Palos de la Frontera

State:

The project aims to replace the three existing heat exchangers with three new double tube heat exchangers.

Objectives

The project aims to replace the three existing heat exchangers with three new double tube heat exchangers. .

In this design neither process gas nor water/steam flows through the boiler shell space. There are no preferred paths and the only parts subjected to high pressure are the gas collecting chambers.

As a result, the double tube design provides non-stop operation, with less damage to the tube bundles and a long service life, as well as optimum exchanger performance.

Other project data

* Image in Spanish

Imagen con la descripción de la actuación para el proyecto "EXPEDIENTE EAE19/21/0019 - Proyecto nuevo relleno de la torre de refrigeración de Puertollano" dentro de los proyectos industriales de Fertiberia (I+D+i)
  • This project will lead to annual energy savings of 2,842 toe/year.
  • File no. 305760
  • Registration date: 15/04/2021

Duration

Budget

Continue reading

Imagen de cabecera para el Proyecto IDAE, dentro de proyectos industriales, mostrando unas válvulas de seguridad y purgadores.
Fertiberia_IDI_I-D-i_Proyectos
Installation of four high-efficiency electric motors
The objective of the proposed investment...
Fertiberia_IDI_I-D-i_Proyectos

Fertiberia, European leaders in high value-added plant nutrition and solutions for industry. We develop a portfolio of next‑generation products and are committed to biotechnology applied to agriculture.

What we do

We design and manufacture the most efficient and sustainable products for agriculture and industry

Tools

Services to facilitate our customers’ daily tasks

ESG

Our pillars to ensure sustainable, innovative and committed investments.

R&D&I

Research, development and innovation for sustainable and responsible growth.

Contact us

Scroll to Top